{"id":1824,"date":"2009-12-15T16:19:07","date_gmt":"2009-12-15T15:19:07","guid":{"rendered":"http:\/\/www.12sur12.org\/2009\/12\/15\/loccupation-de-lestuaire-de-la-loire\/"},"modified":"2021-01-04T17:05:31","modified_gmt":"2021-01-04T16:05:31","slug":"loccupation-de-lestuaire-de-la-loire","status":"publish","type":"post","link":"https:\/\/www.12sur12.org\/?p=1824","title":{"rendered":"L&#8217;occupation de l&#8217;estuaire de la Loire"},"content":{"rendered":"<p><a href=\"https:\/\/www.12sur12.org\/wp-content\/uploads\/2009\/12\/estuaire.jpg\" title=\"l\u2019occupation de l\u2019estuaire de la Loire\"><img decoding=\"async\" src=\"https:\/\/www.12sur12.org\/wp-content\/uploads\/2009\/12\/estuaire-150x150.jpg\" alt=\"l\u2019occupation de l\u2019estuaire de la Loire\" \/><\/a><\/p>\n<p>En cliquant sur la vignette ci-dessus, on pourra voir une carte de l&rsquo;estuaire de la Loire o\u00f9 on distingue:<\/p>\n<ul>\n<li>en bleu, les sites d&rsquo;extraction de granulats, dont le Pilier et le Charpentier sont en cours d&rsquo;exploitation, l&rsquo;Astrolabe et le Cairnstrath en projet;<\/li>\n<li>les parcs \u00e9oliens en projet : WPD (parc des deux \u00eeles, 120 \u00e9oliennes \u00e0 15km de Noirmoutier), Nass&amp;Wind (parc de Gu\u00e9rande, 60 \u00e0 80 \u00e9oliennes \u00e0 15km de la C\u00f4te Sauvage) et EDF (parc de la Banche, 12 \u00e9oliennes \u00e0 7km de la Baie de La Baule);<\/li>\n<li>SEM-REV,  site de recherches sur les \u00e9nergies marines \u00e0 10km au large du Croisic sur la partie sud-ouest du plateau du Four; en projet, une base d&rsquo;exp\u00e9rimentation pour machines utilisant les vagues pour produire de l&rsquo;\u00e9nergie, qui devrait \u00eatre op\u00e9rationnelle en \u00e9t\u00e9 2010;<\/li>\n<li>le chenal d&rsquo;acc\u00e8s \u00e0 Nantes\/St Nazaire (zone noire et blanche)<\/li>\n<li>en vert, des zones de protection environnementale.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>En cliquant sur la vignette ci-dessus, on pourra voir une carte de l&rsquo;estuaire de la Loire o\u00f9 on distingue: en bleu, les sites d&rsquo;extraction de granulats, dont le Pilier et le Charpentier sont en cours d&rsquo;exploitation, l&rsquo;Astrolabe et le Cairnstrath &hellip; <a href=\"https:\/\/www.12sur12.org\/?p=1824\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[102,104],"tags":[],"class_list":["post-1824","post","type-post","status-publish","format-standard","hentry","category-energies-renouvelables","category-granulats"],"_links":{"self":[{"href":"https:\/\/www.12sur12.org\/index.php?rest_route=\/wp\/v2\/posts\/1824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.12sur12.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.12sur12.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.12sur12.org\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.12sur12.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1824"}],"version-history":[{"count":1,"href":"https:\/\/www.12sur12.org\/index.php?rest_route=\/wp\/v2\/posts\/1824\/revisions"}],"predecessor-version":[{"id":4834,"href":"https:\/\/www.12sur12.org\/index.php?rest_route=\/wp\/v2\/posts\/1824\/revisions\/4834"}],"wp:attachment":[{"href":"https:\/\/www.12sur12.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.12sur12.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.12sur12.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}